LOCKED v1.0 Two-zone strategy locked; pre-construction items below Β· Source: Peter Shin, 2026-05-15

LDD-26 Β· South Gym Rebound + Acoustic Wall

Status: 🟒 LOCKED v1.0 β€” Peter's spec is internally consistent and disciplined. Air-gap items below are pre-construction reconciliation, not v1.0 blockers.

One-line intent

Calm athletic infrastructure: a two-zone south wall that takes ball impacts down low and absorbs reverb up high, all in the gym's restrained industrial language.

Design intent Β· AI render

⚠️ STALE detail β€” flagged 2026-05-17. The sliver of gym floor at the bottom of frame depicts the OLD spec (polished hardwood with a faint volleyball line). Per Peter's revised LDD-29 Β§25–§27 the gym floor is now matte poured-urethane in medium warm-gray with NCAA basketball + beach volleyball striping. Priority: LOW β€” gym floor is incidental at the bottom edge; the rebound wall is the subject. Update the inline prompt's floor line + palette "warm white-oak hardwood floor" mention and regenerate via Codex when this render is next refreshed.

FPO Β· AI render AI-rendered elevation of the 35-foot south gym rebound + acoustic wall β€” soft-charcoal plywood-based impact panels below the 16-foot AFF shadow-gap datum, dark-charcoal microperf-faced mineral-wool acoustic field above, three dark-bronze sconces at human-scale datum, upper indirect linear wash and low-level indirect glow
Architectural intent render of the south gym rebound + acoustic wall β€” disciplined two-zone composition with the lower charcoal impact zone and upper faced-mineral-wool acoustic field, divided by a subtle shadow-gap datum at 16' AFF. For Position Only: AI-generated from the prompt below. Click to enlarge.
Codex prompt & how to regenerate

To regenerate: hand the prompt below to Codex / ChatGPT with image generation enabled (or any gpt-image-1 / DALL-E 3 endpoint), save the result as site/diagrams/26-rebound-wall-fpo.png, redeploy. Page picks it up automatically.

Recommended params: model gpt-image-1, aspect 16:9, size 1536 Γ— 1024.

Prompt:

Architectural interior elevation rendering of the south gym rebound + acoustic wall β€” the LDD-26 system: a 35'-wide composition with a lower athletic rebound zone in soft charcoal, an upper acoustic moderation zone in faced mineral wool, divided by a subtle shadow-gap datum at 16' AFF, unified with the gym's three-layer lighting hierarchy. Photoreal head-on elevation view of the full 35' wall length, captured at calm late-afternoon ambient light. 16:9 aspect. No people in frame.

Framing. Eye-level head-on elevation view, ~24mm equivalent, centered on the 35' wall length. The wall fills the frame from floor to roof structure (24' AFF total height visible). Slight 3Β° rotation off pure orthographic so the shadow-gap datum at 16' AFF and the recessed panel reveals read clearly. Camera position implies the viewer is standing roughly in the center of the gym, ~25' off the wall.

Two-zone vertical organization (the subject of the render). The wall reads as two clearly differentiated horizontal architectural fields:

LOWER ATHLETIC REBOUND ZONE (floor β†’ 16' AFF): plywood-based impact panel system across the full 35' width, finished in matte soft-charcoal coating (NRC of the coating is moderated, ball-visible, glare-controlled, hides wear). Panel rhythm is disciplined and modular, aligned with the PEMB structural girt order β€” read as a calm tectonic rhythm, NOT decorative checkerboard or arbitrary joint layout. Typical 4' or 5' panel module width. Joints between panels read as fine controlled reveals / hairline shadows, NOT exposed fasteners or visible kick-strips. No separate visible kick-strip at base β€” consistent visual system across full lower height. Subtle athletic floor-edge transition at bottom; no decorative vinyl base trim.

TRANSITION DATUM at 16' AFF: a restrained horizontal shadow-gap datum (~Β½"–¾") running the full 35' width. Reads as architecture, NOT as a wainscot or chair rail. The shadow gap is clean and continuous; no decorative trim, no contrasting band.

UPPER ACOUSTIC MODERATION ZONE (16' AFF β†’ ceiling, ~10' tall): an acoustically absorptive architectural field across the full 35' width. Mineral-wool panel system with ball-tolerant facing β€” perforated metal scrim or microperf board in dark charcoal, calm matte finish. Reads as a quiet recessive field β€” softer in surface character than the lower zone, but not visually busy. NO recording-studio decorative aesthetics, NO exposed mineral wool, NO acoustic graphics or busy panel patterns.

Upper PEMB zone (top edge of frame). Glimpse of exposed dark-charcoal PEMB structure β€” primary purlins, secondary framing β€” coordinating with the acoustic field below. One or two suspended dark-charcoal acoustic cloud modules visible at the upper crop, recessed into the broader infrastructure band.

Unified three-layer lighting. UPPER INDIRECT LINEAR: concealed at the wall/ceiling junction, casting a soft downward wash across the upper acoustic field β€” atmospheric perimeter glow, no visible LED source. WALL SCONCES: three small, low-profile, matte dark-bronze sconces at human-scale datum (~7' AFF), distributed across the 35' wall length, casting warm low pools onto the lower zone. Restrained industrial form. LOW-LEVEL INDIRECT LINEAR: subtle concealed source near floor reading as reflected glow at the wall/floor transition, NOT a visible LED strip.

Floor (bottom of frame). Polished light-warm hardwood athletic floor with a faint volleyball court line marking running parallel to the wall at the bottom edge of frame. Clean base transition at the wall/floor edge.

Material palette. Soft-charcoal matte plywood impact panel system (lower zone), dark-charcoal microperf/perforated-metal-faced mineral-wool acoustic field (upper zone), dark-charcoal exposed PEMB structure, dark-bronze metal sconces, warm white-oak hardwood floor. Faint warm dimmable LED color. No bright sport colors. No glossy institutional finishes.

What this is NOT (critical). Do NOT render as a school gymnasium (bright white walls, painted basketball court stripes on the wall, FRP institutional panel aesthetic, fluorescent strip lighting). Do NOT render as a racquetball court (high-impact glossy white walls). Do NOT render with decorative sports branding, team logos, scoreboards, or motivational lettering. Do NOT show exposed mineral wool in the upper zone β€” the facing must read as a clean architectural surface, not an acoustic-treatment retrofit. NO checkerboard panel rhythm. NO arbitrary or chaotic joint layouts. NO visible wall sleeves, kick-strips, or applied wall-mounted athletic equipment. NO recording-studio diffuser shapes (no diamond or trapezoidal panels). NO bright primary colors. NO chrome or polished-steel sconces (they are dark bronze). NO visible LED strip lighting at any layer.

Style direction. Professional architectural visualization, photoreal, evenly exposed. Calm and quiet mood. Sharp focus throughout, no shallow DOF. The 16' AFF shadow-gap datum should read as the dominant horizontal organizing line. Should feel like the cover image of an architecture monograph illustrating "calm athletic infrastructure integrated into residential architecture," not a sports-facility marketing brochure.

Why this matters

The gym needs a south face that earns its keep three ways at once β€” takes a beating, kills the upper-volume echo, and stays visually calm. Get this wrong and the gym either feels like a school gym (institutional, harsh, echoing) or like a fragile architectural set piece that breaks under real use. Peter's two-zone strategy (rebound low / acoustic high) is the right framework: it does each job in the zone best suited to it, and the lighting language ties it back into the unified gym perimeter.

This is the paired sister wall to LDD-25 north gym ballet wall. Together they bracket the gym between the LDD-04 west gym hero wall (clerestory) and the LDD-03 spine wall (gym/living boundary).

Locked decisions

Two-zone organization (LOCKED)

Zone Height Purpose
Lower athletic rebound floor β†’ ~16' AFF Controlled impact + rebound + abuse tolerance
Upper acoustic moderation ~16' AFF β†’ ceiling Reverberation reduction + visual softening

Lower athletic rebound zone

Lower wall finish (LOCKED)

Lower abuse strategy

Panelization

Upper acoustic moderation zone

Transition datum at ~16' AFF (LOCKED)

Lighting integration (unified with broader gym perimeter)

Hidden future infrastructure

Maintenance + serviceability

Open items / requires engineer review

Cross-references

Cost drivers

This is the cheapest of the four gym walls β€” the spec is intentionally cost-effective.

Likely-case rollup: $16–30K for the complete wall.

For comparison: LDD-25 north ballet wall is $30–55K. The mirror wall does more (mirrors + barre + protective net + embedded sconces); the rebound wall is genuinely cost-effective infrastructure. The asymmetry is intentional.

Air-gap concerns

  1. The "inexpensive mineral wool" call is fine IF acoustic targets are specified. Mineral wool from 1" to 4" varies hugely in absorption. Without an NRC target and a specific frequency band (gym noise is often mid-band, 500 Hz–2 kHz), the cheapest panel might absorb 0.5 at the target frequency β€” not enough to actually moderate gym reverberation. Lock NRC β‰₯ 0.85 minimum for the upper zone and let that drive material thickness + density.
  2. Mineral wool needs a ball-tolerant facing. Bare or even fabric-wrapped mineral wool will be punctured by errant balls eventually, even at 16'+ AFF. Spec a perforated metal scrim, microperf board, or rigid fabric facing rated for impact. The "cheapest mineral wool" should NOT mean exposed wool.
  3. Plywood impact panels need real athletic impact validation. Commercial gym plywood panel kits exist (e.g., Connor Sports, Robbins) β€” but they're sized for sport floors, not walls. Pick a wall-rated impact panel system or detail a custom plywood-on-blocking assembly with the framing engineer. "Plywood-based" + "robust backing" is direction, not spec.
  4. PEMB girt impact loading is not standard. PEMB girts are typically sized for cladding wind loads (~25–35 psf design pressure). Athletic ball impact is a localized peak load (a hard volleyball can deliver ~50–100 lbf concentrated). Either spec a stiffer girt at the lower zone or add secondary blocking. Catch this in the PEMB order, not in the field.
  5. Touch-up paint + tough coating is often a contradiction. Industrial-grade gym wall coatings (epoxy, urethane) are hard and abrasion-resistant but they don't accept touch-ups cleanly β€” the patch flashes and looks worse than the dent. Either (a) pick a satin/matte acrylic that touches up well but accept that it'll wear faster, or (b) pick the hard coating and accept that maintenance means re-coating a panel section, not touching up.
  6. The 16' AFF datum needs a horizontal-alignment audit. Verify that the 16' transition lines up with the west gym hero wall's clerestory bottom, or with another major gym horizontal (window head, mezzanine edge from LDD-13). If it doesn't, the gym gets two competing horizontals and the disciplined calm intent slips.
  7. "Hidden future infrastructure" must be detailed NOW, not deferred. Concealed anchor points only exist if blocking + fastener-rated substrate is installed before drywall/panels go up. Decide today: minimum grid spacing (4' Γ— 4'? 2' Γ— 2'?), load rating (50 lbs? 500 lbs?), and substrate type. Otherwise this LDD's "future flexibility" promise is theoretical β€” and 5 years from now a homeowner trying to mount a pull-up rig will discover there's nothing to bolt to.
  8. Charcoal matte wall + ball visibility tradeoff. Soft charcoal hides scuffs and reduces glare β€” but it also reduces ball contrast for some sports (volleyball + futsal balls are often white/yellow; charcoal background is fine for those). Confirm with a paint chip + a ball in the actual lighting before locking the LRV (light-reflectance value). If LRV is too low (< 10), the wall reads as a void at night and ball tracking suffers.
  9. Asymmetry with LDD-25 north wall is the design intent β€” but it bears stating. North wall = mirror + calm + recessed glass surface, vibration-isolated. South wall = plywood + rebound + acoustic, attached to PEMB. These two walls have opposite philosophies (isolated/calm vs. attached/active). This is correct for their functions, but verify the gym reads as a coherent room, not two halves of different rooms. Test by standing in the center and looking at both walls in the same field of view.

Diagram

Elevation diagram of the 35-foot south gym rebound + acoustic wall β€” lower plywood impact panel zone below the 16-foot AFF shadow-gap datum, upper faced-mineral-wool acoustic zone above, three wall sconces, upper indirect linear and low-level indirect lighting lines
35' south wall elevation β€” two-zone composition divided by 16' AFF shadow-gap datum, lower plywood impact panels in soft charcoal, upper faced mineral-wool acoustic field, unified three-layer lighting. Generated plan diagram from the SpicyRiceCakes architecture toolchain. Click to enlarge.

Status

🟒 Green β€” LOCKED v1.0. Spec is internally consistent and the two-zone strategy is sound. Air-gap items above are pre-construction reconciliation (acoustic NRC target, coating selection, future-anchor grid) β€” none change the v1.0 design intent. Highest-priority follow-ups before bidding: (1) lock NRC target for upper zone + select faced panel system, (2) confirm PEMB girt spec at lower zone, (3) document the hidden-anchor grid.